|
Part 1 - General |
Part 2 - Project Phases |
Part 3 - Technical Requirements |
Sustainability |
Appendices |
|
1.01 Working Relationships |
2.01 Schematic Design Phase |
1.0- General Requirements |
A - Design Goals |
A - Standard Drawings |
|
1.02 Codes, Regulations,
Safety |
2.02 Design Development
Phase |
2.0- Site Work |
B - Design Process |
B - Standard Documents |
|
1.03 Design Considerations |
2.03 Construction Documents |
3.0- Concrete |
C - Design Guidelines |
C - Standard Forms |
|
1.04 Space Standards |
2.04 Bidding Phase |
4.0- Masonry |
1. Energy Use |
D - Technical Information |
|
1.05 Miscellaneous |
2.05 Construction Phase |
5.0- Metals |
2. Building Materials |
|
|
|
2.06 Post Construction |
6.0- Wood & Plastics |
3. Indoor Environmental Quality |
|
|
|
|
7.0- Thermal & Moisture
Protection |
4. Site Work |
|
|
|
|
8.0- Doors & Windows |
D - References |
|
|
|
|
9.0- Finishes |
|
|
|
|
|
10.0- Specialties |
|
|
|
|
|
11.0- Equipment |
|
|
|
|
|
12.0- Furnishings |
|
|
|
|
|
13.0- Special Construction |
|
|
|
|
|
14.0- Conveying Systems |
|
|
|
|
|
15.0- Mechanical |
|
|
|
|
|
16.0- Electrical |
|
|